1.1 - Introduction, Legal Duties, Key Parties
1.2 - Amendment Record
1.3 - Description of Works and Design Criteria
1.4 - Fire Detection and Information for Fire Strategy
1.5 - Residual Hazards and Provision for Safe Access
1.6 - Incoming Plans to site Drawings and Emergency Contacts
1.7 - Removal or Dismantling of Installed Plant and Equipment
-
3.1 Building Fabric
3.1.1 Architects Finishing Schedule
3.1.2 Architects Final Drawings
3.1.3 Roofing and Cladding
3.1.4 Windows and Curtain Walling
3.1.5 Level Access Doors, Dock Levellers & Personnel Doors
3.1.6 Partitioning & Dry Lining
3.1.7 Passive Fire Protection
3.1.8 Stainless Steel Staircases and Balustrades
3.1.9 Wall & Floor Tiling
3.1.10 Internal Floor Finishes
3.1.11 Decorating
3.1.12 IPS Vanity Units &Toilet Cubicles
3.1.13 Structural Steelwork & Gatehouse
3.1.14 Precast Concrete Walls, Stairs & Lift Shaft
3.1.15 Raised Access Flooring
3.1.16 Engineers Drawings
3.1.17 Sealants
3.1.18 Warehouse Concrete Floor
3.1.19 Kitchen Equipment
3.1.20 Gas Membrane
3.1.21 Intumescent Paint
3.1.22 Whitewall
3.1.23 Glazed Screens​
-
3.2 External Works
3.2.1 Landscaping
3.2.2 Block Paving
3.2.3 Entrance Gates, Fencing, Barriers, Cycle and Bin Store
3.2.4 Earthworks
3.2.5 Vibro Piling
3.2.6 External Service Yard & Concrete Slab
3.2.7 Drainage & Petrol Interceptors
3.2.8 White Lining
3.2.9 External Furniture -
3.3 Mechanical
3.3.1 Mechanical Works
3.3.2 Siphonic Drainage
3.4 Electrical
3.4.1 Electrical Works
3.4.2 PV Panels
3.4.3 Lifts
​
​
​
​
​
​
4.1 - Practical Completion Handover Checklist
4.2 - Warranties Schedule
4.3 - Key Schedule
4.4 - Meter Readings
5.1 - Aftercare Plan
5.2 - Defects Contacts
6.1 - Water / Meter Isolation & Leak Detection
6.2 - Office AC - Including Local Control
6.3 - Building Management System - Including Reception Sounder
6.4 - Rainwater Harvesting
6.5 - Plant Deck
6.6 - Domestic Hot Water
6.7 - Water Isolation
6.8 - LV Incoming Supply and Panel
6.9 - Electric Meter
6.10 - Fire Alarm
6.11 - Distribution Board
6.12 - Disabled Refuge Alarm
6.13 - Disabled WC Alarm
6.14 - EV Chargers
6.15 - Internal and External Lighting Controls
6.16 - Electric Meter
6.17 - EV Chargers
6.18 - PV Panels