Click on the section you are looking for and it will take you directly to the page for easy downloading or viewing of the document.

1.1 - Introduction, Legal Duties, Key Parties

1.2 - Amendment Record

1.3 - Description of Works and Design Criteria

1.4 - Fire Detection and Information for Fire Strategy

1.5 - Residual Hazards and Provision for Safe Access

1.6 - Incoming Plans to site Drawings and Emergency Contacts

1.7 - Removal or Dismantling of Installed Plant and Equipment 

  • 3.1 Building Fabric
    3.1.1 Architects Finishing Schedule
    3.1.2 Architects Final Drawings
    3.1.3 Roofing and Cladding
    3.1.4 Windows and Curtain Walling
    3.1.5 Level Access Doors, Dock Levellers & Personnel Doors
    3.1.6 Partitioning & Dry Lining
    3.1.7 Passive Fire Protection
    3.1.8 Stainless Steel Staircases and Balustrades
    3.1.9 Wall & Floor Tiling
    3.1.10 Internal Floor Finishes
    3.1.11 Decorating
    3.1.12 IPS Vanity Units &Toilet Cubicles
    3.1.13 Structural Steelwork & Gatehouse
    3.1.14 Precast Concrete Walls, Stairs & Lift Shaft
    3.1.15 Raised Access Flooring
    3.1.16 Engineers Drawings
    3.1.17 Sealants
    3.1.18 Warehouse Concrete Floor
    3.1.19 Kitchen Equipment
    3.1.20 Gas Membrane
    3.1.21 Intumescent Paint
    3.1.22 Whitewall

      3.1.23 Glazed Screens​

  • 3.2 External Works
    3.2.1 Landscaping
    3.2.2 Block Paving
    3.2.3 Entrance Gates, Fencing, Barriers, Cycle and Bin Store
    3.2.4 Earthworks
    3.2.5 Vibro Piling
    3.2.6 External Service Yard & Concrete Slab
    3.2.7 Drainage & Petrol Interceptors
    3.2.8 White Lining
    3.2.9 External Furniture

  • 3.3 Mechanical
    3.3.1 Mechanical Works
    3.3.2 Siphonic Drainage
    3.4 Electrical
    3.4.1 Electrical Works
    3.4.2 PV Panels
    3.4.3 Lifts

​

​

​

​

​

​

4.1 - Practical Completion Handover Checklist

4.2 - Warranties Schedule

4.3 - Key Schedule

4.4 - Meter Readings

5.1 - Aftercare Plan

5.2 - Defects Contacts

6.1 - Water / Meter Isolation & Leak Detection

6.2 - Office AC - Including Local Control

6.3 - Building Management System - Including Reception Sounder

6.4 - Rainwater Harvesting

6.5 - Plant Deck

6.6 - Domestic Hot Water

6.7 - Water Isolation

6.8 - LV Incoming Supply and Panel

6.9 - Electric Meter

6.10 - Fire Alarm

6.11 - Distribution Board

6.12 - Disabled Refuge Alarm

6.13 - Disabled WC Alarm

6.14 - EV Chargers 

6.15 - Internal and External Lighting Controls

6.16 - Electric Meter

6.17 - EV Chargers

6.18 - PV Panels

QR Codes will be printed and placed either on or nearby the equipment recorded for training and demonstration. 

SITE LOCATION

Unit 1 Panattoni Park,

Highworth Road, 

South Marston, 

Swindon,

SN3 4TZ

Panattoni PNG.png
Winvic_Secondary_logotype_RGB_black.png
Winvic_Secondary_logotype_RGB_black.png

​

Brampton House, 

19 Tenter Road

Moulton Park, 

Northampton, 

NN3 6PZ

bottom of page